Items where Author is "Laptali, E"

Up a level
Export as [feed] RSS
Group by: Item Type | No Grouping
Number of items: 5.

LAPTALI, E., BOUCHLAGHEM, N.M. and WILD, S., 1997. A computer model for time and cost optimisation during the pre-tender stage. In: [Conference], Cairns, Queensland, July 1997, Queensland.

LAPTALI, E., BOUCHLAGHEM, N.M. and WILD, S., 1996. Linear programming for time and cost optimisation. In: The Organisation and Management of Construction, CIB W65 Commission on Organisation and Management of Construction, Glasgow, 1996, Glasgow.

LAPTALI, E., BOUCHLAGHEM, N.M. and WILD, S., 1996. An integrated computer model for time and cost optimisation. In: ARCOM 96, Sheffield Hallam University, Sheffield, September 1996, Sheffield.

BOUCHLAGHEM, N.M., LAPTALI, E. and WILD, S., 1995. Construction of reinforced concrete multi-storey office buildings: a simulation model for time/cost calculations. Building Research and Information, 23 (4), pp. 227-233. ISSN 0961-3218

BOUCHLAGHEM, N.M. and LAPTALI, E., 1995. Expert systems within the construction industry in the UK. Automation in Construction, 3 (4), pp. 321-325. ISSN 0926-5805

This list was generated on Sat Apr 20 11:18:27 2024 UTC.