Ma, Z., Yang, Z., Liu, S. and Wu, S. ORCID: 0000-0002-5633-2229, 2018. Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components. Automation in Construction, 95, pp. 86-97. ISSN 0926-5805
Full text not available from this repository.
Official URL: https://doi.org/10.1016/j.autcon.2018.08.002
Item Type: | Journal article | ||||||||
---|---|---|---|---|---|---|---|---|---|
Publication Title: | Automation in Construction | ||||||||
Creators: | Ma, Z., Yang, Z., Liu, S. and Wu, S. | ||||||||
Publisher: | Elsevier | ||||||||
Date: | November 2018 | ||||||||
Volume: | 95 | ||||||||
ISSN: | 0926-5805 | ||||||||
Identifiers: |
|
||||||||
Divisions: | Schools > School of Architecture, Design and the Built Environment | ||||||||
Record created by: | Linda Sullivan | ||||||||
Date Added: | 20 Aug 2020 11:01 | ||||||||
Last Modified: | 20 Aug 2020 11:01 | ||||||||
URI: | https://irep.ntu.ac.uk/id/eprint/40489 |
Actions (login required)
Edit View |
Views
Views per month over past year
Downloads
Downloads per month over past year