Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components

Ma, Z., Yang, Z., Liu, S. and Wu, S. ORCID: 0000-0002-5633-2229, 2018. Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components. Automation in Construction, 95, pp. 86-97. ISSN 0926-5805

Full text not available from this repository.
Item Type: Journal article
Publication Title: Automation in Construction
Creators: Ma, Z., Yang, Z., Liu, S. and Wu, S.
Publisher: Elsevier
Date: November 2018
Volume: 95
ISSN: 0926-5805
Identifiers:
NumberType
10.1016/j.autcon.2018.08.002DOI
S0926580517308853Publisher Item Identifier
1354041Other
Divisions: Schools > School of Architecture, Design and the Built Environment
Record created by: Linda Sullivan
Date Added: 20 Aug 2020 11:01
Last Modified: 20 Aug 2020 11:01
URI: https://irep.ntu.ac.uk/id/eprint/40489

Actions (login required)

Edit View Edit View

Views

Views per month over past year

Downloads

Downloads per month over past year