Ma, Z, Yang, Z, Liu, S and Wu, S ORCID: https://orcid.org/0000-0002-5633-2229, 2018. Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components. Automation in Construction, 95, pp. 86-97. ISSN 0926-5805
Full text not available from this repository.
Official URL: https://doi.org/10.1016/j.autcon.2018.08.002
Item Type: | Journal article |
---|---|
Publication Title: | Automation in Construction |
Creators: | Ma, Z., Yang, Z., Liu, S. and Wu, S. |
Publisher: | Elsevier |
Date: | November 2018 |
Volume: | 95 |
ISSN: | 0926-5805 |
Identifiers: | Number Type 10.1016/j.autcon.2018.08.002 DOI S0926580517308853 Publisher Item Identifier 1354041 Other |
Divisions: | Schools > School of Architecture, Design and the Built Environment |
Record created by: | Linda Sullivan |
Date Added: | 20 Aug 2020 11:01 |
Last Modified: | 20 Aug 2020 11:01 |
URI: | https://irep.ntu.ac.uk/id/eprint/40489 |
Actions (login required)
Edit View |
Statistics
Views
Views per month over past year
Downloads
Downloads per month over past year