Tesfagaber, G, Cutting-Decelle, AF, Anumba, CJ, Baldwin, AN and Bouchlaghem, NM, 2002. IDEF 3 modelling of the construction process: a basic requirement for improving the exchanges of process information in construction. In: CIB - W78 International Conference, Denmark, 2002, Denmark.
Full text not available from this repository.Item Type: | Conference contribution |
---|---|
Creators: | Tesfagaber, G., Cutting-Decelle, A.F., Anumba, C.J., Baldwin, A.N. and Bouchlaghem, N.M. |
Date: | 2002 |
Divisions: | Schools > School of Architecture, Design and the Built Environment |
Record created by: | EPrints Services |
Date Added: | 09 Oct 2015 10:41 |
Last Modified: | 09 Oct 2015 10:41 |
URI: | https://irep.ntu.ac.uk/id/eprint/16790 |
Actions (login required)
Edit View |
Statistics
Views
Views per month over past year
Downloads
Downloads per month over past year