Are Tier-one contractors making their money out of wasteful procurement arrangements?

Sarhan, S ORCID logoORCID: https://orcid.org/0000-0002-0105-2350, Pasquire, C ORCID logoORCID: https://orcid.org/0000-0001-6344-2031, Manu, E ORCID logoORCID: https://orcid.org/0000-0002-9002-3681 and King, A ORCID logoORCID: https://orcid.org/0000-0002-6195-687X, 2016. Are Tier-one contractors making their money out of wasteful procurement arrangements? In: 24th Annual Conference of the International Group for Lean Construction, Boston, USA, 20-22 July 2016.

[thumbnail of PubSub8908_Pasquire.pdf]
Preview
Text
PubSub8908_Pasquire.pdf - Published version

Download (553kB) | Preview

Abstract

The UK Government challenged construction to achieve 50% faster delivery and a 33% reduction of clients' capital costs by 2025 – prevailing business models won't meet these targets. Eliminating waste from construction design and delivery as advocated by lean ideals is therefore a necessary step towards these goals. However, waste understood simply as the improvement of current processes rather than fundamental system redesign will not be enough. Obtaining a better understanding and conceptualisation of waste in construction is therefore becoming more crucial. One aspect of this is to challenge the apparent coherence of prevailing procurement practices generated by the institutional, organisational, and commercial environments that surround the design and delivery of construction projects. This paper contributes to this by examining Tier 1 contractors and presents examples of practices that open debate on how to challenge prevailing procurement models for construction. Through literature review and interviews, the study discusses the factors influencing the ‘Principal-Agent’ relationship demonstrating how procurement arrangements often mirror institutional forces. These forces do not necessarily guarantee better value services, they are more likely to serve the interests of large industry players with the bargaining power to create new rules (North, 1994). A radically different delivery model, where the client intends to eliminate the management fees and confrontational behaviours of their Tier 1 contractors is described.

Item Type: Conference contribution
Alternative Title: Are Tier 1 contractors making their money out of wasteful procurement arrangements?
Creators: Sarhan, S., Pasquire, C., Manu, E. and King, A.
Date: July 2016
Divisions: Schools > School of Architecture, Design and the Built Environment
Record created by: Linda Sullivan
Date Added: 09 Aug 2017 08:33
Last Modified: 04 Feb 2022 10:02
Related URLs:
URI: https://irep.ntu.ac.uk/id/eprint/31398

Actions (login required)

Edit View Edit View

Statistics

Views

Views per month over past year

Downloads

Downloads per month over past year